Link: IEC 62386-218:2018 Digital addressable lighting interface Particular requirements for control gear. Dimming Curve Selection (device type 17)
Source: BSI Standards
ISO 6787:2018 Assembly tools for screws and nuts. Adjustable wrenches
Torsion testing
Hardness testing
Performance
Testing conditions
Clearances
Clearance distances
Dimensions
Wrenches
Adjustment
Nuts
Threaded fasteners
Screws (bolts)
Production equipment
Hand tools
Assembling
Link: ISO 6787:2018 Assembly tools for screws and nuts. Adjustable wrenches
Source: BSI Standards
BS EN 15695-2:2017 Agricultural tractors and self-propelled sprayers. Protection of the operator (driver) against hazardous substances Filters, requirements and test procedures
Agricultural tractors
Spraying equipment (agriculture)
Forestry equipment
Dangerous materials
Agricultural equipment
Performance testing
Performance
Sprayers
Air cleaning equipment
Aerosols
Crop protection
Air purification
Occupational safety
Dust
Particulate air pollutants
Air filters
Instructions for use
Link: BS EN 15695-2:2017 Agricultural tractors and self-propelled sprayers. Protection of the operator (driver) against hazardous substances Filters, requirements and test procedures
Source: BSI Standards
BS ISO 4898:2018 Rigid cellular plastics. Thermal insulation products for buildings. Specifications
Cellular materials
Insulation (thermal)
Insulating materials (thermal)
Thermal design of buildings
Materials handling
Link: BS ISO 4898:2018 Rigid cellular plastics. Thermal insulation products for buildings. Specifications
Source: BSI Standards
BS EN 15695-1:2017 Agricultural tractors and self-propelled sprayers. Protection of the operator (driver) against hazardous substances Cab classification, requirements and test procedures
Crop protection
Performance testing
Classification systems
Agricultural tractors
Particulate air pollutants
Spraying equipment (agriculture)
Forestry equipment
Air cleaning equipment
Verification
Dangerous materials
Instructions for use
Protective cabs
Sprayers
Dust
Aerosols
Air filters
Air purification
Cabs
Agricultural equipment
Occupational safety
Link: BS EN 15695-1:2017 Agricultural tractors and self-propelled sprayers. Protection of the operator (driver) against hazardous substances Cab classification, requirements and test procedures
Source: BSI Standards
ISO/IEC 20248:2018 Information technology — Automatic identification and data capture techniques — Data structures — Digital signature meta structure
IEC 62386-224:2018 Digital addressable lighting interface Particular requirements for control gear. Integrated light source (device type 23)
ISO 37157:2018 Smart community infrastructures. Smart transportation for compact cities
Pollution
Passenger transport
Population
Cities
Transportation
Infrastructure
Link: ISO 37157:2018 Smart community infrastructures. Smart transportation for compact cities
Source: BSI Standards
Press release: New building performance standards to save MOD up to 20%
Infrastructure is a vital defence capability delivering accommodation, training facilities and critical assets such as runways and workshops to enable our armed forces to live, work, train and deploy. Recent DIO projects include building a jetty at Portsmouth Naval Base so the aircraft carrier HMS Queen Elizabeth can dock, and resurfacing runways at RAF Akrotiri, RAF Gibraltar, and RAF Valley.
The defence estate is large, diverse and widely dispersed across the UK and overseas. In the UK, it covers around 230,000 hectares comprising military training areas, naval bases, barracks, airfields, supply depots, and offices. Construction on these sites is sometimes subject to specific defence requirements but the majority is similar to other sectors, so the new standards have been developed in accordance with comparators from industry and other government departments. They are designed to be used by MOD staff and industry partners responsible for the planning, costing and delivery of the infrastructure assets and projects funded by MOD.
The new standards, Joint Services Publication (JSP) 315, are expected to save up to 20% on construction costs by creating efficient standards, enabling faster and more cost-effective project development and delivery. They also recognise the success and cost savings DIO has achieved in recent years from increasing the use of modular construction and standardisation of designs, as well as utilising 3D digital and interactive technology.
Graham Dalton, DIO’s Chief Executive, said:
The new standards mark a step forward in how DIO enables our military to provide the most effective and efficient solutions and how we work better with the construction industry. The revised standards make it absolutely clear what our requirements are and will contribute to a significant cost and time saving on our infrastructure projects.
The new standards and supporting guidance set a series of reference designs for specific defence infrastructure requirements and benchmark capital and operational costs for the planning and delivery of MOD infrastructure.
The revised JSP 315 can be found here
Link: Press release: New building performance standards to save MOD up to 20%
Source: Gov Press Releases
Press release: Images offer glimpse of A45 Chowns Mill upgrade
As part of the government’s £15.2bn road investment strategy, Highways England is developing a scheme to improve the A45/A6 Chowns Mill junction, leading to more reliable and safer journeys for people and businesses by reducing congestion and increasing capacity on the road.

Work will include widening the A45 and A6 approaches to provide additional traffic lanes, creating an additional roundabout section on the south side of the existing roundabout and introducing traffic signals to manage traffic safely and effectively.
The work will:
- improve journey times by providing additional lanes
- improve safety by changing the junction layout and introducing traffic signals – managing the flow of traffic through the junction more effectively and reducing the chance of collisions
- support economic growth by encouraging continued investment in the regional economy and support new business and residential opportunities
- improve access for cyclists and pedestrians thanks to new signalled crossings which will make it safer to cross the junction – all crossing points will be designed for users with disabilities
The A45 is a key link between the A14 and M1, serving the growing Northampton, Wellingborough and Rushden areas.
As part of the scheme the junction will be redesigned as a half hamburger layout with a new link road connecting the A6 North and A5028 with the existing roundabout. This will improve the existing junction to allow better flow of traffic reducing congestion through the junction. All approaches will be widened to provide extra lanes and increase capacity.
Highways England project manager, Rachael Langfield, said:
Chowns Mill roundabout currently suffers from severe congestion at peak travel times, leading to long queues on all approaches. This congestion will increase as traffic levels grow.
The scheme we have developed will improve journey times and safety along the A45 and A6 corridors as well as boost capacity to support planned growth in the local area, which is great news for the local and regional economy.
There will be no need to purchase any additional land with improvements to the junction carried out within the existing roundabout boundary.
Construction is due to begin in late 2019 and is expected to be completed within two years.
Public information exhibitions take place tomorrow and Saturday where people can find out more.
The exhibition times and locations are as follows:
- Friday 6 April 2018 – 2pm to 8pm Park Road Baptist Church, Park Road, Rushden, Northamptonshire, NN10 0RG
- Saturday 7 April 2018 – 10am to 4pm Park Road Baptist Church, Park Road, Rushden, Northamptonshire, NN10 0RG
People can also ask questions about the scheme by:
- emailing info@a45chownsmill.com
- visit the Highways England website where you can also sign up for email alerts:
- write to: A45 Chowns Mill improvement team , Highways England, Stirling House, Lakeside Court, Osier Drive, Sherwood Business Park, Nottingham NG15 0DS.
- call the Highways England Customer Contact Centre on 0300 123 5000.
General enquiries
Members of the public should contact the Highways England customer contact centre on 0300 123 5000.
Media enquiries
Journalists should contact the Highways England press office on 0844 693 1448 and use the menu to speak to the most appropriate press officer.

Link: Press release: Images offer glimpse of A45 Chowns Mill upgrade
Source: Gov Press Releases
