BS 5975:2019 – TC Tracked Changes. Code of practice for temporary works procedures and the permissible stress design of falsework

Falsework
Beams
Axial stress
Stress analysis
Mobile scaffolds
Hardwoods
Struts
Density
Dimensions
Structural members
Erecting (construction operation)
Softwoods
Ground-water drainage
Site investigations
Girders
Bailey bridges
Loading
Props
Stability
Soils
Mass
Scaffolding components
Maintenance
Structural design
Bending stress
Supports
Legislation
Brickwork
Wind loading
Climatic loading
Structural timber
Building sites
Field testing
Temporary structures
Steels
Strength of materials
Visual inspection (testing)
Structural systems
Factor of safety
Mechanical properties of materials
Independent scaffolds
Structural steels
Foundations
Traffic
Design
Blocks (building)
Soil testing
Modulus of elasticity
Concretes

Link: BS 5975:2019 – TC Tracked Changes. Code of practice for temporary works procedures and the permissible stress design of falsework
Source: BSI Standards