The Law Applicable to Contractual Obligations and Non-Contractual Obligations (Amendment etc.) (EU Exit) Regulations 2019

These Regulations are made in exercise of the powers conferred by section 8(1) of the European Union (Withdrawal) Act 2018 (c. 16) in order to address failures of retained EU law to operate effectively and other deficiencies (in particular under section 8(2)(a), (b), (c) and (g) of that Act) arising from the withdrawal of the UK from the European Union.

Link: The Law Applicable to Contractual Obligations and Non-Contractual Obligations (Amendment etc.) (EU Exit) Regulations 2019
Source: Legislation .gov.uk

The Cat and Dog Fur (Control of Import, Export and Placing on the Market) (Amendment) (EU Exit) Regulations 2019

These Regulations amend Regulation (EC) 1523/2007 banning the placing on the market and import to, or export from, the Community of cat and dog fur, and products containing such fur (OJ L 343, 27.12.2007, p.1) and the Cat and Dog Fur (Control of Import, Export and Placing on the Market) Regulations 2008. These Regulations are made in exercise of the powers in section 8(1) of the European Union (Withdrawal) Act2018 (c. 16)in order to address failures of retained EU law to operate effectively and other deficiencies arising from the withdrawal of the United Kingdom from the European Union (and in particular the deficiencies referred to in paragraphs (a), (b), (c), (d), and (g) of section 8(2)).

Link: The Cat and Dog Fur (Control of Import, Export and Placing on the Market) (Amendment) (EU Exit) Regulations 2019
Source: Legislation .gov.uk

The Railways (Amendment) (EU Exit) Regulations (Northern Ireland) 2019

These Regulations are made in exercise of the powers in section 8(1) of, and paragraph 21 of Schedule 7 to, the European Union (Withdrawal) Act 2018 (c.16) in order to address failures of retained EU law to operate effectively and other deficiencies (in particular under 8(2)(a), (b), (c), (d) and (g)) arising from the withdrawal of the United Kingdom from the European Union.

Link: The Railways (Amendment) (EU Exit) Regulations (Northern Ireland) 2019
Source: Legislation .gov.uk

The Common Organisation of the Markets in Agricultural Products and Common Agricultural Policy (Miscellaneous Amendments) (EU Exit) Regulations 2019

These Regulations are made in exercise of the powers conferred by section 8(1) of, and paragraph 21 of Schedule 7 to, the European Union (Withdrawal) Act 2018 (c. 16) in order to address failures of retained EU law to operate effectively and other deficiencies (in particular under section 8(2)(a), (b), (d) and (g)) arising from the withdrawal of the UK from the European Union.

Link: The Common Organisation of the Markets in Agricultural Products and Common Agricultural Policy (Miscellaneous Amendments) (EU Exit) Regulations 2019
Source: Legislation .gov.uk

The Rail Safety (Amendment etc.) (EU Exit) Regulations 2019

These Regulations are made in exercise of the powers conferred by section 8(1) of, and paragraph 21 of Schedule 7 to, the European Union (Withdrawal) Act 2018 (c.16) in order to address failures of retained EU law to operate effectively and other deficiencies (in particular under section 8(2)(a), (d) and (g)) arising from the withdrawal of the UK from the European Union.

Link: The Rail Safety (Amendment etc.) (EU Exit) Regulations 2019
Source: Legislation .gov.uk

The Market Measures (Miscellaneous Provisions) (Amendment) (EU Exit) Regulations 2019

These Regulations are made in exercise of the powers conferred by the European Union (Withdrawal) Act 2018 (c. 16) in order to address failures of retained EU law to operate effectively and other deficiencies (in particular under section 8(2)(a), (c), (d), (e) and (g)) arising from the withdrawal of the United Kingdom from the European Union.

Link: The Market Measures (Miscellaneous Provisions) (Amendment) (EU Exit) Regulations 2019
Source: Legislation .gov.uk

The Tees Combined Cycle Power Plant Order 2019

This Order authorises Sembcorp Utilities (UK) Limited (referred to in this Order as the Undertaker) to construct, operate and maintain an electricity generating station with a nominal net electrical output capacity of up to 1,700 MWe (1,748 MWe gross) at ISO Conditions together with associated development located on land within the Wilton International site, Teesside.

Link: The Tees Combined Cycle Power Plant Order 2019
Source: Legislation .gov.uk

BS ISO 4141-1:2019 Road vehicles. Multi-core connecting cables Test methods and requirements for basic performance sheathed cables

Road vehicle components
Chemical-resistance tests
Heat ageing tests
Road vehicles
Electric conductors
Performance
Electrical components
Diameter
Towed road vehicles
Sheathed cables
Multicore cables
Artificial weathering tests
Flame propagation
Fire tests
Wear resistance
Electric cables
Cable cores

Link: BS ISO 4141-1:2019 Road vehicles. Multi-core connecting cables Test methods and requirements for basic performance sheathed cables
Source: BSI Standards