This Order authorises Sembcorp Utilities (UK) Limited (referred to in this Order as the Undertaker) to construct, operate and maintain an electricity generating station with a nominal net electrical output capacity of up to 1,700 MWe (1,748 MWe gross) at ISO Conditions together with associated development located on land within the Wilton International site, Teesside.
Link: The Tees Combined Cycle Power Plant Order 2019
Source: Legislation .gov.uk