Press release: Foreign Secretary calls for a united response

While we await an explanation from Russia of how a military-grade nerve agent of a type developed by Russia came to be used in the UK, the Foreign Secretary Boris Johnson has today been calling his counterparts and leaders of international organisations to set out what we know and our concerns that, if as we suspect is highly likely the Russian state was responsible, this would be further reckless behaviour which threatens the international community and requires an international response.

The Foreign Secretary has emphasised that if this was a direct act by the Russian state then it would not simply be a threat to the UK, but a clear violation of the chemical weapons convention, a breach of international law and a threat to those who abide by the rules-based international order as a whole.

The French Foreign Minister Le Drian offered France’s total solidarity for an unacceptable act, and noted that President Macron had promised to stand by the UK as it prepares to take concrete measures against Russia’s breach of international order. The French government stressed particular concerns about Russia’s use of chemical weapons elsewhere, as is evident with their support to Asad’s murderous regime in Syria.

In speaking to the German Foreign Minister Sigmar Gabriel, the Foreign Secretary emphasised how countering Russian disinformation, halting Russia’s adventurism in the western Balkans and reducing Russia’s ongoing involvement in Ukraine’s humanitarian crisis were issues of paramount importance to Germany and the UK alike.

Speaking to the NATO Secretary General, Jens Stoltenberg, the Foreign Secretary reiterated the importance of NATO standing together to counter the threat Russia poses not just to the UK, but to our NATO allies also. He was pleased that the NATO Secretary General expressed his support and solidarity, and agreed that NATO unity was paramount, as it was to counter other existing threats to NATO partners, including in eastern Europe where UK troops are stationed alongside troops from various Allies. They both agreed that Russian actions repeatedly threaten the security of NATO partners – from the Baltics, Balkans, Ukraine and Georgia – and NATO must stand as an alliance to call out Putin’s behaviour. The UK will brief the North Atlantic Council at tomorrow’s session.

Further information

Media enquiries

For journalists

Link: Press release: Foreign Secretary calls for a united response
Source: Gov Press Releases

Press release: Attempted attack on Palestinian Prime Minister: Statement

Minister Burt said:

I am shocked to hear of the attack on Palestinian Prime Minister Hamdallah’s convoy in Gaza this morning. I strongly condemn this attack, for which there is no justification. My thoughts are with those who were injured, and I wish them a speedy recovery.

The UK continues to support the return of the legitimate Palestinian Authority to the Gaza Strip, and we encourage those involved to engage constructively towards this objective. We urge non-violence, dialogue and progress towards a sustainable reconciliation and an improvement in the humanitarian situation in Gaza.

Further information

Media enquiries

For journalists

Link: Press release: Attempted attack on Palestinian Prime Minister: Statement
Source: Gov Press Releases

Press release: PM call with Chancellor Merkel: 13 March 2018

A Downing Street spokesperson said:

The Prime Minister spoke to Chancellor Merkel earlier this afternoon to update her on the ongoing investigation into the Salisbury incident.

The Prime Minister set out the conclusion reached by the UK Government that it was highly likely that Russia was responsible for the attack against Sergei and Yulia Skripal.

They discussed the pattern of aggressive Russian behaviour and agreed it would be important to act in unison with allies to counter it.

Chancellor Merkel condemned the attack and said she stood in full solidarity with the UK.

They agreed that the international community should coordinate closely as the investigation developed and in the wake of Russia’s response.

Link: Press release: PM call with Chancellor Merkel: 13 March 2018
Source: Gov Press Releases

Press release: PM call with President Trump: 13 March 2018

A Downing Street spokesperson said:

The Prime Minister spoke to President Trump earlier this afternoon to update him on the ongoing investigation into the Salisbury incident.

The Prime Minister set out the conclusion reached by the UK Government that it was highly likely that Russia was responsible for the attack against Sergei and Yulia Skripal.

President Trump said the US was with the UK all the way, agreeing that the Russian Government must provide unambiguous answers as to how this nerve agent came to be used.

Link: Press release: PM call with President Trump: 13 March 2018
Source: Gov Press Releases

Press release: Iconic Spaghetti Junction immortalised in new Birmingham attraction

To mark the 50th anniversary of work starting on the road and to celebrate 2018 as the Year of Engineering, Highways England can reveal that it will be celebrated in a model at the new attraction.

Construction started on the sprawling structure some fifty years ago and today it continues to carry more than 220,000 vehicles every day.

The road will be joining other notable landmarks from Birmingham including The Library of Birmingham, The Cube, New Street Station and the BT Tower.

Highways England’s Regional Director, Catherine Brookes, said:

Spaghetti Junction is one of those structures that is known around the world and we’re thrilled to see the road included as part of the new attraction.

The opening of the new attraction later this year also marks our Year of Engineering campaign which is designed to get children thinking about engineering and the world around them. It is also 50 years since work started to build Spaghetti Junction and it’s timely that it should be recognised for its local and national significance in supporting the motorway network.

The first of 45 incredible scaled masterpieces are now being recreated by a specialist team of LEGO Model Builders.

More than 6,800 hours will be ploughed in to the design and construction of the entire MINILAND complex over the forthcoming months.

Construction of Spaghetti Junction took some four years to complete and its elevated position sees constant maintenance work taking place underneath it, often unseen by many motorists on their daily commute.
Spaghetti Junction in numbers:

  • Spaghetti Junction has 559 concrete columns, some reaching to 80 feet high
  • Construction started in 1968 and took four years to complete.
  • It is known officially as Gravelly Hill Interchange
  • Today, it continues to carry more than 220,000 vehicles every day
  • It is subject to regular maintenance work, which includes the replacing of the road surface, installation of new waterproofing material, painting and vegetation

To find out more about the Year of Engineering, head online to the year of engineering website.

LEGOLAND Discovery Centre Birmingham is set to open to the general public this summer.
More information can be found online.

General enquiries

Members of the public should contact the Highways England customer contact centre on 0300 123 5000.

Media enquiries

Journalists should contact the Highways England press office on 0844 693 1448 and use the menu to speak to the most appropriate press officer.

Link: Press release: Iconic Spaghetti Junction immortalised in new Birmingham attraction
Source: Gov Press Releases

Press release: See behind Highways England’s roadworks with ‘Open Doors’

Highways England is taking part in ‘Open Doors’ and giving members of the public a unique chance to go behind the scenes of five ‘live’ construction sites to see how the roads and structures are built or maintained.

The national week-long initiative starts on Monday 19 March until Saturday 24 March and anyone interested in visiting the sites is urged to register for a place.

With 2018 being the “Year of Engineering” this is also an ideal opportunity for young people considering career ideas, adults thinking about a change in occupation, parents, guardians and people involved in education to come and find out about the diverse range of skills and professions needed on site.

Mike Wilson, Chief Highways Engineer and director of Safety, Engineering and Standards, said:

“Our roads connect the country with around 4 million journeys on them each day. With a record level of investment in roads now is an exciting time for us to show, as part of Open Doors, the hard work that goes on behind the roadworks.

“We want to inspire future generations to join Highways England and as well as organising our own activities in support of the Government’s 2018 Year of Engineering campaign, this is an ideal opportunity for young people, parents and teachers to come to our construction sites and take a closer look at what we do.”

The five Highways England sites taking part are below – there are limited spaces and registration is needed in advance via the Open Doors website.

East of England

Three sites for the A14 Cambridge to Huntingdon road scheme (Swavesey, Brampton and Ermine Street – A1198 near Godmanchester) – A14 project talk, guided bus site tour and Q & A session.

Midlands

M5 Oldbury Viaduct – a project talk, tour of the viaduct (above and below) to see work being carried out.

South East

M2 Stockbury Viaduct – a welcome talk and video and the opportunity to climb up scaffolding (using stair cases not ladders) to see where the bridge is being lifted.

With the UK needing an extra 20,000 engineering graduates a year, the Year of Engineering campaign is showing young people what an engineer is, and what they can achieve. Highways England need a continuing pipeline of young engineers to help deliver the massive investment planned for our motorways and major A-roads, benefitting the economy and improving people’s lives.

To sign up for a visit at the Highways England’s sites or for more details about the initiative visit the Open Doors website.

The most recent Open Doors event saw over 3,000 bookings across more than 130 construction sites in England, Scotland and Wales.

General enquiries

Members of the public should contact the Highways England customer contact centre on 0300 123 5000.

Media enquiries

Journalists should contact the Highways England press office on 0844 693 1448 and use the menu to speak to the most appropriate press officer.

Link: Press release: See behind Highways England’s roadworks with ‘Open Doors’
Source: Gov Press Releases

Press release: 20 years after the Northamptonshire Easter floods

The Environment Agency and its partners are calling on people to take steps to prepare for flooding and keep themselves and their families safe, 20 years after the Easter floods of 1998 caused devastation in Northamptonshire.

In 1998, an unusually wet spring led to severe flooding, with thousands of homes across the county affected. Two people lost their lives and over 150 people were hospitalised.

Northamptonshire County Council, Northampton Borough Council, Northamptonshire Fire and Rescue Service, Northamptonshire Police and the Environment Agency worked together both over the course of the floods and during the recovery process. In the 20 years since Easter 1998, great strides have been made to help protect over 7,000 properties that are at risk of flooding in the county.

The EA has invested £12 million in flood risk management in Northamptonshire over the last 2 decades. This investment contributed towards the completion of a number of works, including the construction of a flood storage reservoir at Weedon and significant improvements on the flood defences at Far Cotton and St James.

The EA is planning with its partners to invest a further £1.8 million by 2021 to reduce flood risk to even more people and properties across the county.

In addition to this investment, the EA has also made progress by using modern technology to improve the way it can warn people when flooding is possible. Over 4,500 properties in Northamptonshire are now signed up to receive flood warnings via their landlines, mobile phones or email addresses through the EA’s free flood warning service.

Although the EA and its partners work around the clock to protect people and their property from flooding, the risk can never be completely eliminated. A third of properties at risk are still not registered to receive flood warnings, as residents have not signed up to the EA’s free flood warning service. The EA urges people to prepare themselves and their loved ones for flooding by signing up now.

Environment Minister Thérèse Coffey said:

Flooding is always devastating for those affected, and I know this has been the case for people and businesses in Northamptonshire.

That is why we have invested almost £12m in Northamptonshire flood defences in the past 20 years with a further £1.8m planned by 2021 to reduce the risk even further for home owners and businesses.

Environment Agency Area Flood Risk Manager Ben Thornely said:

Although we can reflect on 20 years of progress being made since the significant floods of 1998, we also recognise that flooding remains a risk to local communities across Northamptonshire. Our staff and our partners work around the clock to protect people and their properties from flooding, but we can never stop the risk completely.

This is why our free flood warning service is so important. Flood warnings give people valuable time to prepare for flooding – time that allows them to move themselves, their families and precious items to safety. Our flood warnings save lives and enable the emergency services to prepare and help communities.

I’d urge residents across the county to check whether they are at risk of flooding and to sign up for flood warnings, by visiting www.gov.uk/flood or calling Floodline on 0345 988 1188.

Cllr Ian Morris, county council cabinet member for transport, highways and environment, said:

Working with partners as the Lead Local Flood Authority for the County, an enormous amount of work has been done in the past two decades to tackle local flood risks.

The Pathfinder projects have empowered communities to tailor-make measures for their local areas, while the award-winning Flood Toolkit provides an online resource which acts as a central point of information for all flood-related issues.

However, we cannot be complacent and we recognise that we must continue to work together with the people of Northamptonshire to further reduce flood risk.

Cllr Mike Hallam, Northampton Borough Council’s Cabinet member for environment, said:

Such events can be disastrous and it can take an age to recover from the devastation they leave in their wake.

A huge amount of work has been done in the past 2 decades to minimise the risk of such an awful event occurring again in Northampton but we remain ready to offer whatever support is needed in the event that it does.

Northamptonshire Fire and Rescue Service’s Deputy Chief Fire Officer David Harding, who served during the flooding 20 years ago, said:

As in 1998, Northamptonshire Fire and Rescue Service is there to help and protect people.

Advances in both training and equipment mean we are well prepared and equipped to respond to all emergency incidents requiring our services, including flooding, but our aim is to help prevent incidents before life is at risk. In this respect I urge everyone to help themselves and be prepared by signing up to the flood warning system.

Link: Press release: 20 years after the Northamptonshire Easter floods
Source: Environment Agency