BS 5974:2017 Planning, design, setting up and use of temporary suspended access equipment. Code of practice

Scaffolding fixing components
Scaffolding processes
Safety anchorages
Construction equipment
Stability
Safety lines
Erecting (construction operation)
Marking
Construction workers
Lifting equipment
Strength of materials
Electrical equipment
Bosuns chairs
Inspection
Factor of safety
Structural design
Winches
Scaffolding components
Design
Training
Safe working load
Dimensions
Construction operations
Cradles (hoists)
Occupational safety
Temporary structures
Management
Decking (scaffolding)
Electrical safety
Mobile working platforms
Lightning
Scaffolds
Passenger hoists
Suspended scaffolds
Ropes
Roofs
Design calculations
Loading

Link: BS 5974:2017 Planning, design, setting up and use of temporary suspended access equipment. Code of practice
Source: BSI Standards