Press release: A556 ‘green bridge’ is winter wonderland

The £1.15 million bridge was one of 7 constructed across the new £192 million bypass which opened in March. Part farm access track and part wildlife corridor, the bridge, west of Mere, has been provided to maintain connectivity between habitats separated by the new dual carriageway.

When the new bridge was used as the site of the official opening ceremony of the road in March, it had only just been planted with a mixture of hedging and plants.

Now, 11 months later, the extensive planting has given birth to a flourishing green border which is providing a safe passage across the road for badgers, voles and other small animals, insects and birds.

Aerial picture showing the Green Bridge before extensive planting
Aerial picture showing the Green Bridge before extensive planting
Aerial picture showing the Green Bridge after extensive planting
Aerial picture showing the Green Bridge after extensive planting

Highways England project manager Paul Hampson said:

The green bridge was the centre-piece of our work to ensure the new A556 was the most environmentally-friendly road Highways England has ever built. We are delighted the planting has really taken hold (and as the drone footage shows it is particularly impressive from the air). We are looking forward to watching the bridge bloom for many years to come.

Constructing the bridge cost about £890,000 with a further £273,000 on ‘greening work’ on the deck, which included planting trees, shrubs and grasses.

The old A556 has also been ‘greened’ and turned into a £5 million B road with dedicated route for pedestrians, cyclists and horse riders featuring a earth border planted with wild flowers to separate it from road traffic.

The project’s green measures earned it a prestigious Green Apple Award for Environmental Best Practice last year.

Construction of the new A556 link road, between the M56 and the M6, started in November 2014 and opened in March with the old road – now the B5569 – handed over to Cheshire East Council in November. The scheme has been delivered as part of the Government’s £15 billion government investment in motorways and major A roads by 2021 which is being delivered by Highways England as part of the Northern Powerhouse initiative.

General enquiries

Members of the public should contact the Highways England customer contact centre on 0300 123 5000.

Media enquiries

Journalists should contact the Highways England press office on 0844 693 1448 and use the menu to speak to the most appropriate press officer.


Link: Press release: A556 ‘green bridge’ is winter wonderland
Source: Gov Press Releases

Press release: Secretary of State Bradley visits Belfast

Following a tour of the facility, during which she spoke to members of staff and students, the Secretary of State addressed the media.

Rt Hon Karen Bradley MP, Secretary of State for Northern Ireland:

I am absolutely delighted to be in Belfast and to be appointed to this important Cabinet post and I am really looking forward to getting down to work as quickly as possible. I want to work with all sections of the community here to help build a Northern Ireland that is fit for the future and that works for everyone.

During my visit to Belfast Metropolitan College, I have been struck by the wonderful education facilities that are available to students here. Throughout the United Kingdom, Northern Ireland is highly regarded for the excellent levels of education it provides, as well as the high calibre of its students – they can hold their heads high and compete with the best from around the world;

And of course I can’t forget the marvellous tourism that this part of the world is so famous for – the Giant’s Causeway, the Mourne Mountains and of course the No 1 visitor attraction in the world – Titanic Belfast. I know my family are already looking forward to getting to know this beautiful part of the United Kingdom.

Of course I have a very important job to do, and as I said yesterday my immediate challenge and key objective is to ensure that Northern Ireland has a devolved government in place in order to address the issues that affect everyone’s lives, including health, education and the economy. I’m also conscious of the need to deliver a Brexit that works for Northern Ireland and to ensure everyone is safe and secure.

It is fitting my first visit should be to Titanic Quarter, which reflects both Belfast and Northern Ireland’s past and its future. Once one of the world’s leading industrial cities and now one of the world’s largest urban-waterfront regeneration schemes.

And I understand the importance of dealing with the past and securing a safe and prosperous future. My aim is to work collaboratively to find solutions to these issues acceptable to everyone.

I have spoken to all the main party leaders. While there will be many challenges in the coming weeks – which all parties will need to rise to – I will do all that I can to ensure that we find a way to restore devolution to Northern Ireland.

Link: Press release: Secretary of State Bradley visits Belfast
Source: Gov Press Releases

Press release: Top construction firms appointed to build new PHE site in Harlow

Three of the UK’s leading construction companies have been chosen to create Public Health England’s (PHE) new state-of-the-art public health science campus and headquarters at Harlow, Essex.

They have been selected for the 4 key elements of the £400 million capital spend programme to create the campus. This includes building and refurbishing new and existing laboratories and office areas; construction of a new arrivals area and logistics centre; and site-wide infrastructure including car parking.

The appointments, creating thousands of construction-related jobs, sees the end of an 18-month procurement process, with work expected to start next month.

The successful companies bid for 4 lots:

  • lot 1 – new build of specialist bioscience laboratory building – Kier Group
  • lot 2 – refurbishment of main building, including laboratories and offices – Wates Construction
  • lot 3 – arrivals, administration and logistics buildings – Wates Construction
  • lot 4 – site-wide infrastructure, external works and energy centre – VolkerFitzpatrick (Royal VolkerWessels)

The appointment of all 3 contractors provides a boost to local employment – particularly in the case of VolkerFitzpatrick, whose head office is located in the neighbouring town of Hoddesdon.

The next steps will see the contractors working with the existing design teams and preparing the site for major construction. This is planned to start in 2019, with phased occupation starting in 2021.

PHE Harlow, as the campus will be known, is expected to employ up to 2,750 people by 2024, with scope for further expansion.

Facilities from Porton in Wiltshire and Colindale in north London, as well as PHE’s central London headquarters, will be relocated to the single centre of excellence for public health research, health improvement and protection.

The campus is critical to the future of PHE, ensuring we will be able to use the latest scientific advances to deliver our world-leading science and evidence for issues such as smoking, alcohol, diabetes, dementia, infectious diseases, environmental hazards and climate change nationally and internationally.

Richard Gleave, PHE Deputy Chief Executive, said:

PHE is delighted to have secured 3 of the leading construction companies in the UK to deliver what will be a world-leading national and international resource.

Much of the work to create PHE Harlow is highly specialised so it’s especially pleasing to have secured 3 of the best companies in their fields to deliver that work. This is yet another milestone for PHE and we can now look forward to the chosen contractors coming on board and bringing their considerable wealth of experience and skills to our programme.

We are also delighted at the very significant opportunities that the construction of PHE Harlow will offer in the surrounding area.

Nigel Brook, Kier Group Executive Director, Construction and Infrastructure Services, said:

This £160 million project is another significant award for Kier in bioscience, building on our track record as a specialist delivery partner in the sector with projects including biomedical research facilities for the University of Cambridge with Project Capella and the Sainsbury laboratory as well as the state-of-the-art Derriford Research Facility for Plymouth University.

We’re looking forward to providing a state-of-the-art facility which will help Public Health England to keep improving the nation’s health and wellbeing.

Ian Vickers, Managing Director, Wates Construction Home Counties, commented:

PHE Harlow will play a pivotal role in improving public health, providing state-of-the-art facilities for industry-leading scientists and doctors to address some of the most pressing medical and environmental challenges the world is currently facing.

It is therefore a particular privilege for Wates to be awarded 2 of the 4 lots. It is also a huge responsibility, and over the next year we will be working closely with PHE and other partners as we prepare to start on site in early 2019.

Richard Offord, Managing Director of VolkerFitzpatrick said:

We are delighted to be working with PHE on such a forward-thinking project. The new public health science campus will support the growth of the local area and we are looking forward to starting work on this exciting opportunity.

Background

  1. PHE submitted an Outline Business Case to government in July 2014. An interim decision was taken in September 2015 to move the majority of PHE functions from Porton to Harlow. In November 2015 the government supported a further proposal to move PHE science facilities at Colindale to Harlow to create a single integrated campus. The government has committed £400 million capital investment for the project.
  2. Today’s announcement comes less than 3 weeks after PHE was granted outline planning permission by Harlow District Council to create its centre of national and international scientific expertise.
  3. It is hoped the public health science campus will be fully operational by 2024, with the first building work expected to start in 2019 and a phased occupation from 2021.
  4. The campus will allow PHE to fully embrace the new technologies of whole genome sequencing, public health interventions and ‘big data’ and transform the delivery of public health science for many years to come. Whole genome sequencing is the mapping of a person’s unique DNA and enables more accurate, sophisticated and cost-effective genetic testing.
  5. Kier Group plc is a leading property, residential, construction and services group which operates across a range of sectors including science, defence, education, housing, industrials, power, transport and utilities. Among the schemes it has been involved in, the most relevant are Project Capella, a large biomedical research facility, and the Sainsbury Laboratory both in Cambridge.
  6. Wates Construction has a long track record across both the public and private sectors and has worked on projects across a variety of areas, including education, commercial, heritage, local authority frameworks and mixed-use. These have included the delivery of major projects for both the Pirbright Institute in Surrey and the Quadram Institute in Norwich.
  7. VolkerFitzpatrick is a multi-disciplinary contractor working in the civil engineering, building, rail, waste and energy infrastructure sectors. The head office is at Hoddesdon in Hertfordshire just eight miles from the PHE Harlow site. Founded in 1921, the company has grown to become one of the top contractors in the UK. VolkerFitzpatrick constructed a third berth at the UK’s new deep-sea hub port, 25 miles from central London at Stanford-le-Hope and was appointed by Siemens to design, build and commission two train care depots in Hornsey, north London and Three Bridges near Crawley, West Sussex. VolkerFitzpatrick is part of VolkerWessels UK, a multi-disciplinary construction and civil engineering group.
  8. Public Health England exists to protect and improve the nation’s health and wellbeing, and reduce health inequalities. It does this through world-class science, knowledge and intelligence, advocacy, partnerships and the delivery of specialist public health services. PHE is an operationally autonomous executive agency of the Department of Health. Twitter: @PHE_uk, Facebook: www.facebook.com/PublicHealthEngland.

Matthew Cooper

Link: Press release: Top construction firms appointed to build new PHE site in Harlow
Source: Gov Press Releases

The A55 Trunk Road (Eastbound Carriageway between Junction 23 (Llanddulas) and Junction 24 (Faenol Interchange), Conwy County Borough) (Temporary Prohibition of Vehicles, Cyclists and Pedestrians) Order 2018 / Gorchymyn Cefnffordd yr A55 (Y Gerbytffordd tua’r Dwyrain rhwng Cyffordd 23 (Llanddulas) a Chyffordd 24 (Cyfnewidfa’r Faenol), Bwrdeistref Sirol Conwy) (Gwahardd Cerbydau, Beicwyr a Cherddwyr Dros Dro) 2018

Link:

The A55 Trunk Road (Eastbound Carriageway between Junction 23 (Llanddulas) and Junction 24 (Faenol Interchange), Conwy County Borough) (Temporary Prohibition of Vehicles, Cyclists and Pedestrians) Order 2018 / Gorchymyn Cefnffordd yr A55 (Y Gerbytffordd tua’r Dwyrain rhwng Cyffordd 23 (Llanddulas) a Chyffordd 24 (Cyfnewidfa’r Faenol), Bwrdeistref Sirol Conwy) (Gwahardd Cerbydau, Beicwyr a Cherddwyr Dros Dro) 2018

Source: Legislation .gov.uk

The A55 Trunk Road (Westbound Carriageway between Junction 24 (Faenol Interchange) and Junction 23 (Llanddulas), Conwy County Borough) (Temporary Prohibition of Vehicles, Cyclists and Pedestrians) Order 2018 / Gorchymyn Cefnffordd yr A55 (Y Gerbytffordd tua’r Gorllewin rhwng Cyffordd 24 (Cyfnewidfa’r Faenol) a Chyffordd 23 (Llanddulas), Bwrdeistref Sirol Conwy) (Gwahardd Cerbydau, Beicwyr a Cherddwyr Dros Dro) 2018

Link:

The A55 Trunk Road (Westbound Carriageway between Junction 24 (Faenol Interchange) and Junction 23 (Llanddulas), Conwy County Borough) (Temporary Prohibition of Vehicles, Cyclists and Pedestrians) Order 2018 / Gorchymyn Cefnffordd yr A55 (Y Gerbytffordd tua’r Gorllewin rhwng Cyffordd 24 (Cyfnewidfa’r Faenol) a Chyffordd 23 (Llanddulas), Bwrdeistref Sirol Conwy) (Gwahardd Cerbydau, Beicwyr a Cherddwyr Dros Dro) 2018

Source: Legislation .gov.uk

Press release: Major overhaul for M3 Winchester junction

Junction 9 of the M3, where it meets the A34 near Winchester will be redesigned under the plans to create dedicated free flow lanes which will allow drivers travelling between the M3 and the A34 to avoid using the junction roundabout. The roundabout itself will be redesigned into a new ‘dumbbell’ layout, which will increase capacity, improve safety and make journey times more reliable.

The plans go on show today in a public consultation lasting until 19 February 2018.

Highways England project manager Simon Hewett said:

Junction 9 is a vital interchange between the M3 and A34. With more than 6,000 vehicles using the junction each hour during peak times, it can often become congested, with queues backing up onto the main carriageway.

The proposals we are publishing today will resolve that by separating out local and long distance traffic. With the new dedicated link roads, through traffic will not have to stop at the roundabout, freeing it up for local traffic and commuters. We are improving access for pedestrians, cyclists and equestrians too. I urge anyone interested to send us their feedback and to come along to one of our exhibitions.

Dr Mike Short CBE, Chairman of the Enterprise M3 Local Enterprise Partnership (LEP) said:

We are delighted that the proposed improvements to junction 9 of the M3 have progressed to the stage of public consultation. This scheme is key investment in our transport infrastructure to support the local economy, by easing transport congestion, which businesses in our area state is a major barrier to growth.

The improvements to junction 9 are critical to enhancing the strategic corridor that runs all the way from the Port of Southampton to the Midlands and the North, which will help to rebalance the national economy. This corridor has a major national and regional strategic role and this improvement scheme is very welcome.

The M3 is the main road between London and the Solent Ports, while the A34 is the main corridor between the south coast and the Midlands. Around 110,000 vehicles use the junction every day, including over 5,500 HGVs, from Southampton and Portsmouth Docks.

The proposed free-flow interchange will help to reduce congestion by removing the need for through traffic to use the roundabout, in turn improving safety. The proposals include:

  • introducing free-flow slip roads, both northbound and southbound between the M3 and A34, so traffic intending to use the interchange will not need to enter the roundabout at the junction
  • reconfiguring the roundabout to a new ‘dumbbell’ road layout increasing capacity and reducing congestion
  • upgrading the cycle routes to complete the gap in route 23 of the National Cycle Network
  • upgrades to footpaths and improved bridleway access for horse riders

The improvements outlined by Highways England today would mean crucial additional capacity for the junction to improve journeys and support development in the Winchester area, which includes up to 11,000 homes and 17,200 jobs in the Winchester area. The proposals will also help to support developments at Southampton container port which are expected to increase freight traffic on the M3 and A34 by one third of the current levels.

Funding for the scheme comes from the Department for Transport’s £15bn Roads Investment Strategy, announced in 2014, which is providing people with better journeys, cutting congestion and improving the economy.

A public consultation on the proposals starts today and runs until 19 February. Highways England is holding five information exhibitions at venues in Winchester and Kings Worthy so that people can examine the proposals and put any questions directly to the project team.

All responses to the consultation will be carefully considered before an announcement is made on a preferred route later this spring. Subject to a successful outcome, construction could start in 2021 and take around two years to complete.

Details on the proposals and the dates for the information exhibitions, along with the opportunity to give us your views are available on the consultation page.

General enquiries

Members of the public should contact the Highways England customer contact centre on 0300 123 5000.

Media enquiries

Journalists should contact the Highways England press office on 0844 693 1448 and use the menu to speak to the most appropriate press officer.

Link: Press release: Major overhaul for M3 Winchester junction
Source: Gov Press Releases

Press release: Work starts on major Northumberland flood scheme

Work has started on a major £600,000 flood scheme which will protect homes and businesses in a Northumberland coastal town from tidal flooding.

The project in the Cowpen area of Blyth will see an existing 180m flood wall upgraded and extended to create a 380m wall to reduce the risk of flooding to the town.

When taking climate change into account these new defences, from Crawford Street to Quay Road, will protect over 1,000 properties into the future while also offering immediate improved protection from tidal flooding to 58 properties.

The work is being funded by the Environment Agency but is being built by Port of Blyth as part of their wider redevelopment of the adjacent Bates and Wimbourne Terminals. The flood defences are due to be completed in Spring 2018.

While the Environment Agency has advised on the specifications and design of the flood wall, Port of Blyth will own and maintain the wall. The Environment Agency will carry out annual inspections.

Leila Huntington, the Environment Agency’s Flood Risk Manager for the North East, said:

This is a great example of a partnership project which protects homes and businesses now and into the future. We have been working closely with Port of Blyth to support the development of a flood wall as part of a wider land development scheme.

By working together it means a greater standard of flood protection improvements can be provided at a reduced cost and with less disruption to the local community.

We’re committed to increasing protection for our at-risk communities and are continuously looking for opportunities to collaborate with our partners and provide the best possible solutions.

Martin Lawlor, Chief Executive of Port of Blyth, added:

This project is a real win-win for the town of Blyth and the Port. As a result of this programme of flood defence work, a huge number of homes and businesses within Blyth will be protected by the flood risks presented by global warming.

On top of this, the scheme enables the Port to move forward with our development plans for connecting our Bates and Wimbourne Quay terminals which will attract inward investment into the town.

A Flood Warning service is available for Blyth residents considered to be at risk of flooding, one for the North Sea at Blyth and another for the North Sea at Blyth Town Centre.

To check if you are at risk of flooding and to sign up for free flood warnings call Floodline on 0345 988 1188 or visit the gov.uk web pages

Link: Press release: Work starts on major Northumberland flood scheme
Source: Gov Press Releases

Press release: Support deal worth £100m agreed for Puma helicopters

The deal will sustain around 25 jobs at Airbus Helicopters UK Ltd in Oxfordshire at the company’s base in Kidlington and at RAF Benson, where the front line squadrons are based and many more across the supply chain.

The support arrangement will enable planned and responsive Puma operations to take place and ensure the maintenance of the aircraft as it provides support to ground troops on the battlefield and to civil and emergency services responding to disasters and emergencies.

Defence Minister Harriett Baldwin said:

This £100 million investment will ensure our Puma helicopters continue to transport British troops and kit to the front line – helping us provide vital support quickly in rapidly evolving situations.

The deal – part of our £178 billion Equipment Plan – will not only give our Armed Forces the kit they need to deal with intensifying global threats, but will also sustain British jobs at Airbus Helicopters.

The contract, which is intended to eventually provide support until the Puma HC Mk2 out of service date, currently planned for March 2025, will provide technical services to support safety management and fault investigation and materiel support including repair and overhaul of major components. It will also provide a training service for RAF maintenance engineers.

The Puma HC Mk2 was the first helicopter deployed to the Caribbean from the UK to provide emergency humanitarian relief to the islands left devastated by Hurricane Irma back in September 2017.

Deploying rapidly, the aircraft provided relief to people who saw their homes destroyed and helped deliver supplies and aid as part of the wider UK emergency response within 72 hours of receiving the call. Separately, the Puma HC Mk2 has been deployed to Afghanistan since 2015 as part of the UK’s contribution to the NATO Afghanistan Mission named Operation RESOLUTE SUPPORT.

Air Vice Marshal Graham Russell, Director Helicopters, for the MOD’s procurement organisation, Defence Equipment and Support said:

The Puma HC Mk2 is carrying out a vital role in troop transport, load movement and humanitarian operations around the world. The upgraded helicopters represent a significant increase in capability over the Mk1.

This support arrangement, which embraces learning from the early days of operating the Mk2 aircraft, will ensure that cost-effective support is always available to allow the user to deliver the capability wherever and whenever it is needed.

Link: Press release: Support deal worth £100m agreed for Puma helicopters
Source: Gov Press Releases

Press release: Trade Bill second reading

International Trade Secretary Dr Liam Fox today sets out how the government’s Trade Bill will benefit businesses and consumers, as the UK progresses towards leaving the EU and shapes its own trade policy for the first time in 40 years.

Dr Fox will explain during the second reading in Parliament today (Tuesday 9 January), how the bill will provide continuity and stability for businesses and consumers by creating the powers necessary to replicate existing EU trade arrangements in UK law.

It will also establish a Trade Remedies Authority to take back powers from the EU to protect UK industry from unfair and injurious trading practices, such as dumping.

This comes after the Treasury’s Customs Bill received its second reading yesterday (Monday 8 January), which will allow the government to create a standalone customs regime and amend the VAT and excise regimes. Together the bills will deliver the necessary powers for the UK to be prepared from day one of leaving the EU.

International Trade Secretary Dr Liam Fox said:

International trade creates jobs, helps lower prices for consumers and contributes to a growing economy – our Trade Bill will provide maximum certainty and continuity for business and consumers.

As an international economic department our priority is to ensure that we continue to benefit from the trade agreements that the EU already has with other countries, and that we maintain the flow of free trade in both directions at the point we leave. Stability now with the flexibility to seize new opportunities in the future is what we seek.

Measures in the bill will only be used to implement any changes needed as a result of transitioning existing trade arrangements that the UK is part of through our membership of the EU. These have already been scrutinised at an EU level and have been overseen in the UK by the EU Select Committees.

Countries with this type of trade agreement with the EU account for some 12% of UK trade. Ensuring that this trade continues will provide certainty and stability for workers, consumers, businesses, and our international trading partners.

The bill will also provide the legislative basis for UK businesses to continue to have guaranteed access to global public procurement markets worth £1.3 trillion every year, by enabling the UK to implement its obligations as an independent member of the multi-national Government Procurement Agreement (GPA). This will protect continuity of access for UK companies overseas and ensure that we can still tap into international expertise and obtain the best deal for UK taxpayers.

Once the UK leaves the EU, it will take up an independent seat at the World Trade Organization (WTO) in Geneva – allowing the UK government to shape global trading policy. DIT has already set up 14 Trade Working Groups across 21 countries to progress existing trade and investment relationships.

Further information

The Trade Bill does not provide for the implementation of trade agreements with countries that the EU does not have an existing trade agreement with and the powers in the bill cannot be used for the implementation of future free trade agreements with new countries.

The Trade Bill provides the necessary powers so that trade arrangements transitioned with third countries can be fully implemented within UK law, and remain operable over time after EU exit.

Since the Constitutional Reform and Governance Act 2010 came into force, the agreements the UK has ratified have already been through a domestic Parliamentary scrutiny process under that Act. The Government has made clear its intention to ratify all EU free trade agreements entered into during our EU membership.

Parliament can approve the terms of the UK membership of the GPA via the process under the Constitutional Reform and Governance Act 2010.

DIT has already sought views on the UK’s approach to its future trade policy and published responses to the White Paper published last October and we continue to seek views as we develop our trade policy.

The government is preparing for when the UK operates its own independent trade remedies system to protect domestic industry injured by goods being unfairly traded, or by unforeseen surges in imports. It has introduced legislation in the Trade Bill to set up a new, independent, arms-length body, the Trade Remedies Authority, to carry out these investigations and make recommendations for duties to be imposed. The framework for the new system that the TRA will operate is set out in the Taxation (Cross-border Trade) Bill.

Link: Press release: Trade Bill second reading
Source: Gov Press Releases