Data Protection Bill [HL]: Data Protection Bill [HL]: Delegated Powers Memorandum
Link: Publication: Data Protection Bill [HL]: Delegated Powers Memorandum
Source: Data Protection Bill
Data Protection Bill [HL]: Data Protection Bill [HL]: Delegated Powers Memorandum
Link: Publication: Data Protection Bill [HL]: Delegated Powers Memorandum
Source: Data Protection Bill
A Bill to make provision for the regulation of the processing of information relating to individuals; to make provision in connection with the Information Commissioner’s functions under certain regulations relating to information; to make provision for a direct marketing code of conduct; and for connected purposes.
Link: Data Protection
Source: Public Bills
A Swindon-based scaffolding company and its director have been sentenced after a worker was left with life-changing injuries.
Link: Company and director sentenced after work left seriously injured
Source: Health and Safety
Data Protection Bill [HL]: Data Protection Bill: summary impact assessment
Link: Publication: Data Protection Bill: summary impact assessment
Source: Data Protection Bill
An Essex-based road haulage firm has been fined after an employee was crushed between two articulated vehicles and subsequently died from his injuries.
Link: Road haulage company fined after worker killed
Source: Health and Safety
Link: The Finance Act 2016, Section 166 (Appointed Day) Regulations 2017
Source: Legislation .gov.uk
To make provision relating to the public open spaces under the management and control of the City of London Corporation; and for related purposes.
Link: City of London Corporation (Open Spaces)
Source: Private Bills
The sea wall at Walton on the Naze helps to protect a wetland site of designated international importance under the Ramsar Convention.
The repair work will ensure the wall remains an effective flood defence for years to come and prevent any further deterioration.
Starting later this month, a section of the tidal defence embankment will be refurbished over a 3 month period.
The project will see the renovation of a 1.7 kilometre stretch of the embankment, running north up the coast from Foundry Lane.
The work is being carried out by civil engineering contractors Breheny and will take place on the crest and seaward sides of the embankment.
Work is due to begin in the week commencing 9 October 2017 and normal working hours will be from 7:30am to 5pm, Monday to Friday.
Kerry Bentley, Asset Performance Officer for the Environment Agency, said:
This is very important work and will ensure the sea wall can continue to provide an effective level of protection in the area for years to come.
The damaged sections of existing sea wall will be removed and new sections will be added.
The old blocks will be placed at the toe of the sea wall as habitat and to help reduce wave impact.
In order to ensure the safe delivery of these works we will need to redirect short sections of the footpath to the rear of the wall.
Link: Press release: Vital renovation for sea wall at Walton on the Naze
Source: Environment Agency
A liquified petroleum gas (LPG) service provider has been fined after a worker suffered serious burn injuries when an LPG vessel ignited.
Link: Company fined after employee suffers serious burn injuries
Source: Health and Safety